Skip to main content

Contractors

Contractor control, end to end

Keep contractor companies, their insurances and certificates with expiry dates. Review the documents they send, run inductions, and give them a portal scoped to exactly what they need. A gate kiosk knows who is on site right now.

How it works

Pick a step. Each screen is a working miniature of the product.

Contractor · electrical

Brightline Electrical Ltd

Documents due
Contact
M. Novak
Requirements
Electrical contractor, 4 items
Upload link
Sent 12 Oct
  1. 12 OctPublic liability insurance: verified
  2. 13 OctElectrical registration: submitted for review
  3. —Employer’s liability insurance: not yet uploaded

What it does

Requirement templates

Define once what a contractor of each kind must hold; apply it to every company you onboard.

Verify or reject

Submitted documents are reviewed, not just collected. Each requirement has a status, and expiries are watched.

Scoped portal

External users see the portal and the activities you granted, nothing else. The server enforces it.

Gate kiosk

Token-based check-in and check-out with your own capture fields. Visitors need no seat.

Inductions & visits

Induction records per person and a calendar of planned visits beside the live gate register.

The gate answers the fire-drill question

The muster point is the wrong place to discover your visitor log lives in a book at reception.

  • Check-in and check-out at a kiosk, no account needed
  • The register shows who is inside at this minute
  • Capture fields are yours: vehicle, badge, host, whatever the site needs

Bring your whole operation into focus

Set up your workspace in minutes and put inspections, observations and actions in one place.